Bernhardt Bridge Inspection Report Now Available

Bernhardt Bridge Inspection Report Now Available

November 08, 2026•1 min read

Cascade River Community Club has received the latest inspection report for the Bernhardt Bridge, prepared by Coffman Engineers following an inspection conducted on September 10, 2026.

Dated November 6, 2026, the report provides an assessment of the bridge’s current condition, documents inspection findings, and identifies maintenance and repair priorities to help guide its ongoing care.

Among the recommendations outlined in the report are:

  • Maintaining and enforcing the existing 5-ton weight limit.

  • Addressing a missing floor-beam connection bolt and loose lateral bracing.

  • Evaluating and repairing scour protection near Abutment 1.

  • Repairing localized concrete deterioration at Pier 2.

  • Cleaning and repainting steel components.

  • Continuing routine inspections and monitoring the bridge after high-water events.

Important reminder: The existing 5-ton weight restriction remains in effect. Please observe all posted bridge weight-limit signage.

We believe keeping our community informed about the condition and maintenance of shared infrastructure is important. Members and visitors are welcome to review the full inspection report below.

[View the Bernhardt Bridge Inspection Report – PDF]

blog author avatar

Cascade River Community Club

Cascade River Community Club

Back to Blog